Our second construction of this year had us building a 3rd and final floor. We also added a property line wall on the north edge which gives us a ground floor corridor access from the front to the back of the property. While doing this we also added a balcony, half corridor access on the 2nd floor, with the intent of adding an exterior staircase in the future. These two efforts afforded us the ability to actually widen the third floor by about a meter as well, just prior to building on it. We also finalized touches on our Donation Wall in the front courtyard we acknowledge all of our foundation supporters for this effort. We will continue to refine and add to this wall with each and every supporter’s desired message. We are so grateful to each of you for support. Separate videos have already been made from this trip on the outreach efforts, weekly services, and more that are already going on at this facility. We are ready for full time missionary residency and appreciate any and all inquiries in that regard.

Verified by MonsterInsights